Music promotion, based on a production of a main text, using video, and two ancillary texts, using print. Regular posts on this blog are simply a reflection of my progression on assignments, building to the music promo as a whole
Wednesday, 28 October 2015
Photography studio shots
Today we had taken shots of another location to film on for our music video. This was the photography studio, again, in college, where we had intended to shoot one of our scenes, sticking to our storyboard and previous planning.
Tuesday, 27 October 2015
Editing day 2
During today we had spent our time in the Editing suite, the Mac's to edit the footage we had got. We had used Photoshop to do so, and firstly had to make sure that our footage had been converted correctly, and in the best video quality settings.
Sunday, 25 October 2015
Day 2 (Olympic park)
Today, as planned, we hada visited olympic park, one of our locations to record one of the shots for a scene in our music video. We had found areas with good lighting and a good backdrop for use in our music video.
Saturday, 24 October 2015
Checking weather forecast for Day 2 filiming
I Had to ensure that the planned day for shooting the video was okay to film on and the weather was not too bad. So i planned ahead by cheking the weather forecast for Sunday, this upcoming weekend.
Friday, 23 October 2015
Olympic park photos
Today we had visited one of our locations, prior to the filming at this location. We had been there to check whether we could get good shots here and had assessed the areas of our location which we were to film at
Thursday, 22 October 2015
Editing Day 1

During today's lesson in media, we had begun on editing for our shots we had taken. So far we had been able to reshoot our shots for the studio, and we had now had one of our scenes which we could work with. We started matching up and synchronising the audio for the music video with the lip synching shots we had got, and cut parts of the music video, keeping only the parts we wanted to keep in our productionWednesday, 21 October 2015
Day 1 filming (Re-shoot)
Tuesday, 20 October 2015
Initial Editing
We had initially began to edit, using photoshop, in this lesson. However, we had encountered some problems. We discovered that the shots we had got for our music studio scene, had not come out as we hoped, and so therefore we had to reschedule a day to shoot this scene again
Monday, 19 October 2015
Day 1 filming
During this lesson, we began to shoot some of the scenes for the first parts of our music video. For this we used the music studio/booth as a scene in our video, as our storyboard we had planned earlier helped us to do so and get the right shot types and angles we needed for this particular scene.
Wednesday, 14 October 2015
Music studio shots
Today, we had got permission to film at one of our potential locations, and had taken photos of the location that we would use. This was the music studio at college which we had put to use.
Monday, 12 October 2015
Portfolio checklist for pre-production work
During this lesson we went through a checklist of all of our pre-production work for our music video production, ensuring that all of these areas had been covered, completed sufficiently, and that they were submitted to the correct places, or updated on our blogs.
Friday, 9 October 2015
Completed Storyboard
For our completed storyboard, we decided to change some of ideas midway, to just a performance based music video as demonstrated. The reason for creating a storyboard for our music video, is because it provided us with a basis to follow which would act as guidelines for us when filming. and editing. This would make things much easier or us, allowing us to be organised, and just making things easier for us in general.
Wednesday, 7 October 2015
Creating storyboard
Friday, 2 October 2015
Getting clearing permissions (for filming on location)
During this lesson, I had requested clearing permissions for one of our locations (St Pauls Cathedral rooftop) by contacting themselves directly via email, however we were not able to get clearing permissions for this location, therefore we had to take a compromise on shots for this location, and decided to use a different location for these shots in particular.
Thursday, 1 October 2015
Talent release forms
Subscribe to:
Posts (Atom)





